Filed under: Uncategorized | Tags: bicycle commuting, bicycle transportation, bicycling, bike, bike commuting, bike path, bikeways, biking, Boulder, commuter bikeway, Denver-Boulder, MUP, transportation, US 36
Which is awesome.
The first phase of the project — from Federal to 88th Street — includes:
• Adding an express lane in each direction of U.S. 36, where bus rapid transit and high-occupancy vehicles can travel, free of charge. Solo drivers also will be able to use the express lane by paying a toll, the cost of which will vary by the time of day.
• Reconstructing existing pavement on U.S. 36 and widening the highway to accommodate 12-foot inside and outside shoulders.
• Replacing the Wadsworth Parkway, Wadsworth Boulevard (at West 112th Avenue) and Lowell Boulevard bridges over U.S. 36.
• Installing a separate commuter bikeway along much of the corridor.
via U.S. 36 from Boulder to Denver to get $311 million in improvements – The Denver Post.
Leave a Comment so far
Leave a comment